Notified Body Change Notification — Process Package (ISO 13485)

€69.00

ISO 13485 & MDSAP Ready

Editable Word & Excel

ISO 13485 / MDSAP / FDA QMSR

EU MDR Annex IX sections 2.4 and 4.10 · MDCG 2020-3

Notified Body Change Notification Procedure and Form — ISO 13485

A procedure for preparing, submitting and tracking change notifications to the Notified Body, with a form that assesses significance, lists the supporting evidence and tracks the response.

€69

VAT calculated at checkout

Get the package

1 SOP + 1 Word form
Instant download

Some changes cannot be implemented until the Notified Body has answered

Annex IX requires the manufacturer to inform the Notified Body of plans for substantial changes to the QMS (section 2.4) and of changes to an approved design that could affect conformity or the conditions of use (section 4.10). The Notified Body decides whether a supplement to the certificate is needed, and the change cannot be released until it has.

This package covers the assessment, the submission package and the gate that stops implementation before approval.

  • 1 SOP
  • 1 Word form
  • Significance assessment
  • Implementation gate
  • Word
  • Instant download

Scope

What the package covers

01

Assessment

A structured significance assessment using the MDCG 2020-3 Rev.1 questions, with the Notified Body’s own rules taking precedence.

02

Submission

Pre-submission discussion, a supporting evidence checklist and the notification package.

03

Control

Response tracking and an authorisation-to-implement gate linked to change control.

Contents

What is in the package

SOP-ISO-35Notified Body Change Notification procedurestrategy, package, response, implementation gate
F-ISO-35.1NB Change Notification Form (Word)significance assessment, evidence checklist, response tracking

Audience

Who the package is for

  • Regulatory teams with MDR-certified devices
  • Manufacturers planning design, supplier or site changes
  • Companies with legacy devices under Article 120

The package assumes you run, or are setting up, an ISO 13485 quality management system. It gives you the procedure and the records; adapting them to your organisation and generating the evidence is your work.

What is included

What you get when you buy

  • SOP-ISO-35 Notified Body Change Notification procedure, Word
  • F-ISO-35.1 NB Change Notification Form, Word
  • Instant download after purchase

Questions

Before you buy

Do all changes need notification?

No. The assessment decides; many changes are documented internally and reported at the next surveillance. The Change Control package is where every change starts.

Can I buy the whole QMS instead?

Yes. This package is one of 30 in the Complete ISO 13485 QMS Documentation Kit, which adds the quality manual, the other procedures and templates, and the six operational logs. €499 for the whole system.

What is the licence?

One-time purchase, single-organisation licence. The files are yours to keep, rebrand and bring under your own document control.

Building the whole QMS?

This package is one of 30 in the complete kit.

The Complete ISO 13485 QMS Documentation Kit ships this package with the quality manual, the 29 other procedures, their templates and the six Excel operational logs, all cross-referenced. €499 for the whole system.

Notified Body Change Notification Procedure and Form — ISO 13485

A procedure for preparing, submitting and tracking change notifications to the Notified Body, with a form that assesses significance, lists the supporting evidence and tracks the response.

Get the package · €69

€69.00