Customer Related Processes — Process Package (ISO 13485)

€69.00

ISO 13485 & MDSAP Ready

Editable Word & Excel

ISO 13485 / MDSAP / FDA QMSR

ISO 13485:2016 · Clause 7.2 · FDA QMSR (ISO 13485 by reference)

Customer Related Processes Procedure and Template — ISO 13485

A procedure for determining and reviewing customer requirements before accepting an order or contract, and a review form that records the decision.

€69

VAT calculated at checkout

Get the package

1 SOP + 1 Word form
Instant download

Requirements are reviewed before acceptance, not after delivery

Clause 7.2 requires the organisation to determine product requirements, including regulatory requirements and user training needs, and to review them before committing to supply: requirements defined, differences resolved, regulatory requirements met, and the ability to deliver confirmed. Auditors look for the record of that review.

This package gives you the procedure and a pre-acceptance form that makes the review quick enough to be done every time.

  • 1 SOP
  • 1 Word form
  • Pre-acceptance review
  • Customer communication
  • Word
  • Instant download

Scope

What the package covers

01

Requirements

Specification, regulatory, delivery and contractual requirements determined for each order.

02

Review

A pre-acceptance checklist and decision, with changes to accepted orders handled the same way.

03

Communication

Product information, enquiries, contracts, feedback and advisory notices, as clause 7.2.3 lists them.

Contents

What is in the package

SOP-ISO-19Customer Related Processes procedurerequirements, review, communication
F-ISO-19.1Customer Order and Contract Review Form (Word)pre-acceptance checklist and decision

Audience

Who the package is for

  • Manufacturers selling through contracts, tenders or distributors
  • OEM and contract manufacturers
  • Companies answering a finding on clause 7.2

The package assumes you run, or are setting up, an ISO 13485 quality management system. It gives you the procedure and the records; adapting them to your organisation and generating the evidence is your work.

What is included

What you get when you buy

  • SOP-ISO-19 Customer Related Processes procedure, Word
  • F-ISO-19.1 Customer Order and Contract Review Form, Word
  • Instant download after purchase

Questions

Before you buy

Can I buy the whole QMS instead?

Yes. This package is one of 30 in the Complete ISO 13485 QMS Documentation Kit, which adds the quality manual, the other procedures and templates, and the six operational logs. €499 for the whole system.

What is the licence?

One-time purchase, single-organisation licence. The files are yours to keep, rebrand and bring under your own document control.

Building the whole QMS?

This package is one of 30 in the complete kit.

The Complete ISO 13485 QMS Documentation Kit ships this package with the quality manual, the 29 other procedures, their templates and the six Excel operational logs, all cross-referenced. €499 for the whole system.

Customer Related Processes Procedure and Template — ISO 13485

A procedure for determining and reviewing customer requirements before accepting an order or contract, and a review form that records the decision.

Get the package · €69

€69.00