ISO 13485 & MDSAP Ready
Editable Word & Excel
ISO 13485 / MDSAP / FDA QMSR
EU IVDR Annex XIII Part B
Post-Market Performance Follow-up (PMPF) Plan Template — EU IVDR
The plan that turns the gaps left in the performance evaluation into post-market objectives, methods and a schedule.
The PMPF plan is generic, so it closes no gap
Annex XIII Part B expects the PMPF to confirm safety and performance, identify emerging risks and keep the performance evaluation current. A plan that lists “literature review and complaint monitoring” without reference to the evidence gaps in the Performance Evaluation Report cannot show what it is meant to achieve.
The template starts from applicability and the link with PMS and performance evaluation, sets specific objectives against the gaps, describes general and specific methods with their rationale, and closes with triggers for review, schedule, actions and a compliance checklist against Part B.
- Word .docx
- Fully editable
- Annex XIII Part B
- Part B checklist
- Instant download
Scope
What the plan covers
Every element of Annex XIII Part B, with objectives traced to the performance evaluation.
01
Aims and objectives
Applicability of PMPF, the five aims of Part B, and specific objectives traced to residual gaps in the Performance Evaluation Report.
02
Methods
General methods, post-market performance studies, the rationale for each method, equivalent devices, state of the art and standards applied.
03
Schedule and follow-up
Triggers for review, time schedule and reporting, actions arising from findings and the review of the plan.
Contents
Sixteen chapters and a Part B checklist
Audience
Who the plan is for
- IVD manufacturers of any class
- Clinical and regulatory affairs teams responsible for the PMPF
- Consultants preparing a performance evaluation file
Where PMPF is judged not necessary, Part B requires a justification in the PMS Plan. The template includes the applicability section for that decision.
What is included
What you get when you buy
- One Word template
- Objective table linked to the PER gaps
- Method and rationale sections
- A compliance checklist against Annex XIII Part B
Questions
Before you buy
Is PMPF mandatory for every device?
A PMPF plan is part of the PMS plan for every device. Where PMPF is not deemed appropriate, a justification must be given, which the applicability section records.
Does it include a study protocol?
No. It plans post-market performance studies where needed. The study protocol is a separate document.
What reports the results?
The PMPF Evaluation Report, also in the IVDR Performance Evaluation Kit.
Can I buy the full kit instead?
Yes. This template is one of 11 in the IVDR Performance Evaluation Kit, priced at €399 against €759 buying all 11 separately.
What software do I need?
Microsoft Word, or a compatible alternative that opens .docx files without reflowing tables.
Is this a one-off purchase?
Yes. The licence is for single-organisation use and the file is yours to keep.
Need the whole file?
This template is one of 11 in the coordinated kit.
The IVDR Performance Evaluation Kit ships the plan with the PMPF Evaluation Report, the PER it feeds and the PMS documents. €399 for the full set.
Post-Market Performance Follow-up (PMPF) Plan Template — EU IVDR
One Word document, PMPF objectives traced to the gaps in your evidence.
€69.00




